•  
          •  
          •  
          •  
          •  

          News

          Brand customers

          Cases

          • The first phase of Line 1 Metro in Lanzhou

            The first phase of Line 1 Metro in Lanzhou

            Project Name:The first phase of Line 1 Metro in Lanzhou

            Project Description:The first phase of Line 1 Metro covers a total length of 26 kilometers underground with 20 stations. The project started on March 28, 2014 and will be put into use in 2016. This metro is the traffic trunk of Lanzhou, crossing from west to east. Furthermore, the whole length of Li...

            More+

          • Guangzhou Line-6 Metro

            Guangzhou Line-6 Metro

            Project Name:Guangzhou Line-6 Metro

            Project Description:Profile: Starting from Jinshazhou Station, Baiyun District to Luogang District, across Liwan District, Yuexiu District and Tianhe District.

            More+

          • Guangdong Sports Games- the Wharf Project of Aquatics Centre in Zhanjiang

            Guangdong Sports Games- the Wharf Project of Aquatics Centre in Zhanjiang

            Project Name:Guangdong Sports Games- the Wharf Project of Aquatics Centre in Zhanjiang

            Project Description:The Aquatics Centre of Zhanjiang resides along the sea-viewing corridor of Jinsha Bay, west neighboring to Beach Avenue and east adjacent to Zhanjiang Bay, facing Zhanjiang Olympic Games Centre- the main stadium of the 14th Guangdong Sports Games across the bay.

            More+

          • Rizhao Power Plant

            Rizhao Power Plant

            Project Name:Rizhao Power Plant

            Project Description:

            More+

          • Afghanistan Angot Oilfield Project

            Afghanistan Angot Oilfield Project

            Project Name:Afghanistan Angot Oilfield Project

            Project Description:

            More+

          • Shandong Laiwu Power Plant

            Shandong Laiwu Power Plant

            Project Name:Shandong Laiwu Power Plant

            Project Description:Shandong Laiwu power plant always adhere to the "people-oriented, safety first, efficiency first" business purposes, has implemented a recovery unit nameplate output, DCS, the installation of electrostatic precipitators (ESP),

            More+

          • Petro-China the Second Gas-processing Plant in Bagtiyarlyk, Turkmenistan

            Petro-China the Second Gas-processing Plant in Bagtiyarlyk, Turkmenistan

            Project Name:Petro-China the Second Gas-processing Plant in Bagtiyarlyk, Turkmenistan

            Project Description:Petro-China the Second Gas-processing Plant in Bagtiyarlyk, Turkmenistan was put into effect on 7 May, 2014.

            More+

          • Petro-China Hubei LNG Project

            Petro-China Hubei LNG Project

            Project Name:Petro-China Hubei LNG Project

            Project Description:Petro-China Hubei LNG project is the largest LNG plant in China until now.

            More+

          • Petro-China Pengzhou Oil Depot Project, Sichuan

            Petro-China Pengzhou Oil Depot Project, Sichuan

            Project Name:Petro-China Pengzhou Oil Depot Project, Sichuan

            Project Description:The Pengzhou oil depot has 520,000 square meters storage capacity with 346,200 ton total reserves.

            More+

          • Hangzhou Xiasha Power Plant

            Hangzhou Xiasha Power Plant

            Project Name:Hangzhou Xiasha Power Plant

            Project Description:Hangzhou Xiasha Power Plant was built to meet the requirements of the north industry park of Hangzhou Economical and Technological Development Area.

            More+

          • Gansu Chongxin Power Plant

            Gansu Chongxin Power Plant

            Project Name:Gansu Chongxin Power Plant

            Project Description:Chongxin Power Plant is located in Chongxin County, Pingliang Municipality, Gansu Province.

            More+

          • Sino-Venezuela Petrochemical Co. Annual 20 Million ton Heavy Crude Oil Refinery Project in Guangdong

            Sino-Venezuela Petrochemical Co. Annual 20 Million ton Heavy Crude Oil Refinery Project in Guangdong

            Project Name:Sino-Venezuela Petrochemical Co. Annual 20 Million ton Heavy Crude Oil Refinery Project in Guangdong

            Project Description:Sino-Venezuela Guangdong Petrochemical Refinery Project is jointly invested by China National Petroleum Corporation and Petroleos de Venezuela, with China holding 60 percent of stocks and Venezuela holding 40 percent of stocks.

            More+

          • Jinping Hydropower Station in Yalong River Area

            Jinping Hydropower Station in Yalong River Area

            Project Name:Jinping Hydropower Station in Yalong River Area

            Project Description:Jinping Hydropower Station owns a total installed capacity of 8,400,000 KW.

            More+

          • Producing Directing Center of Southern Power Grid EHV Power Transmission Company in Guangzhou

            Producing Directing Center of Southern Power Grid EHV Power Transmission Company in Guangzhou

            Project Name:Producing Directing Center of Southern Power Grid EHV Power Transmission Company in Guangzhou

            Project Description:Producing Directing Center of Southern Power Grid EHV Power Transmission Company in Guangzhou covers a total building area of 99,542 square meters. It has three floors underground and three floors aboveground.

            More+

          • Guangzhou Mingcheng Plaza

            Guangzhou Mingcheng Plaza

            Project Name:Guangzhou Mingcheng Plaza

            Project Description:Mingcheng Plaza, invested by Guangzhou Jindongyuan Real Estate Co., Ltd in 2002, covers a total land area of 18,040 square meters with 76,474 square meters above the ground and 34,350 square meters under the ground.

            More+

          • Wanda Plaza in Baiyun District, Guangzhou

            Wanda Plaza in Baiyun District, Guangzhou

            Project Name:Wanda Plaza in Baiyun District, Guangzhou

            Project Description:Wanda Plaza lies in Baiyun District, covering a total land area of 21.09 hectares and a total building area of 563,000 square meters. It serves for shopping center, five-star hotel, outdoor business street, office buildings and so forth.

            More+

          • The Second Phase of Guangzhou Paper Mill Relocation

            The Second Phase of Guangzhou Paper Mill Relocation

            Project Name:The Second Phase of Guangzhou Paper Mill Relocation

            Project Description:The project covers a total building area of 80,000 square meters with more than 160 million RMB investments.

            More+

          • Guangqi Hualong Base

            Guangqi Hualong Base

            Project Name:Guangqi Hualong Base

            Project Description:This project is located in Guangzhou Municipality.

            More+

          Products

          銷售部

          客服部

          您好,是時候升級你的瀏覽器了!你正在使用 Internet Explorer 的過期版本,Internet Explorer 8 可以為你提供更快、更安全的瀏覽體驗,提供更好的隱私保護。立即下載
          返回首页